Electricity

2024-06-262024-06-282024-07-01TSO (The Stationery Office), customer.services@thegazette.co.uk46530508696

APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE 10(1)(A) OF THE ELECTRICITY (NI) ORDER 1992 AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER 2003

1. Full name of the applicant:

Powerhouse Generation Ltd.

2. Address of the applicant(s) or, in the case of a body corporate, the registered or principal office.

Suite 105, Lisburn Enterprise Centre

Ballinderry Road

Lisburn

BT28 2BP

3. Where the applicant is a company, the full names of the current Directors and the company's registered number.

Norman Crowley, Eoin Hayes, Alan Keogh, Sam Alexander

Company Registration No: NI619465

4. Where a holding of 20 per cent, or more of the shares (see Note) of an applicant is held by a body corporate or partnership or an incorporated association carrying on a trade or business with or without a view to profit, the name(s) and address(es) of the holder(s) of such shares shall be provided.

PHG Holdings Ltd

Suite 105, Lisburn Enterprise Centre

Ballinderry Road

Lisburn

BT28 2BP

5. Desired date from which the licence is to take effect.

1st July 2024.

6. The number of generating stations intended to be operated under the licence (if granted).

One

7. A sufficient description specifying the actual or proposed locations of those stations. E.g.: by reference to townlands, local government districts, postal address, etc.

Newry Power site at 68 Cloughanrammer Road, Carnmeen, Newry, BT34 1QG (54 12’38.4”N 6 20’52.2”W)

8. A description of how those stations will, in each case, be fuelled or driven.

The generators shall be fuelled by Gasoil (Diesel) and Hydrotreated Vegetable Oil (HVO).

9. The date when any proposed generating stations are expected to be commissioned.

August/September 2024.

10. The capacity and type of each unit within the generating station (MW).

There shall be Ten 2MW generators. Internal Combustion Engines (ICEs) fitted with cleanup equipment to facilitate compliance with the Medium Combustion Plant Directive (MCPD) Total 20MW.

11. A statement of the extent (if any) to which the applicant considers it necessary for powers under schedule 3 (compulsory acquisition of land etc.) and under Schedule 4 (other powers etc.) to the Order to be given through the licence for which he is applying, together with a statement of any specific purposes for which those powers are felt necessary.

N/A

12. Details of any licences held, applied for or being applied for by the applicant in respect of the generation, participation in transmission or supply of electricity.

None currently held for this generation.

Powerhouse Generation Ltd currently hold Demand Side licences (Generation and Supply) issued by UREGNI.

A copy of the maps accompanying this application are available for inspection by the public at the principal office of the Utility Regulator (NIAUR, Queens House, 14 Queen Street, Belfast, BT1 6ED) between 10.00am and 4.00 pm on any working day.