THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED)

DIRECTION DECISIONS   

Pursuant to regulations 6(11) and 6(12) of the above Regulations, the Secretary of State gives notice of the following decision(s), in respect of application(s) made under regulation 6 of the above Regulations requesting a direction confirming that a relevant project need not be accompanied by an environmental statement and confirming the Secretary of State’s agreement to the grant of consent.

Reference Operator Project Name Quad/ Block Direction Issued
DRA/715 BP Exploration Operating Co Ltd Clair Ridge Development Well 206/08 13/09/2019
DRA/658 ConocoPhillips Petroleum Company U.K. Ltd Joanne SZ Development Well (S14) 30/07 30/09/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to marine environment, and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal. Appropriate controls will be in place to reduce the likelihood of accidental events.
Reference Operator Project Name Quad/ Block Direction Issued
DRA/649 Shell U.K. Ltd Penguins Tybalt Development Well 211/08 02/09/2019
DRA/649 Shell U.K. Ltd Penguins Tybalt Development Well 211/08 16/09/2019
DRA/629 Petrofac Facilities Management Ltd Warwick 204/30b-A Appraisal Well 204/30 18/09/2019
DRA/710 Total E&P North Sea UK Ltd Isabella 30/12d Exploration Well 30/12 20/09/2019
DRA/698 Nautical Petroleum Ltd Chimera Exploration Well 03/17 25/09/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges, atmospheric emissions and interference with other users of the sea. Discharges assessed as no risk to marine environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal, and works will be undertaken in accordance with applicable navigational conditions.  Appropriate controls will be in place to reduce the likelihood of accidental events.
Reference Operator Project Name Quad/Block Direction Issued
PLA/712 Dana Petroleum E&P Ltd Gannet E PL4418 pipeline stabilisation 21/30 27/09/2019
Main reasons / conclusions on which decision is based Main considerations related to installation of infrastructure and associated deposit of materials on the seabed, and marine discharges. Discharges assessed as no risk to the marine environment, and impacts assessed as localised and not significant.
Mitigation features / measures Deposits will be the minimum required to achieve objectives and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/Block Direction Issued
PLA/631 Zennor Pathway Ltd Finlaggan Development 21/05, 22/01 & 16/26 29/7/2019
Main reasons / conclusions on which decision is based Main considerations related to installation of infrastructure and associated deposit of materials on the seabed, marine discharges and interference with other users of the sea.  Discharges assessed as no risk to the marine environment, and impacts assessed as localised and not significant.
Mitigation features / measures Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/ Block Direction Issued
PRA/273 Equinor UK Ltd Sleipner T Platform, Utgard Field Commencement of Production 16/18 04/09/2019
PRA/43 Apache Beryl I Ltd Start of Production – Storr Field 09/13 20/09/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features/measures Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increases are as specified in the application.
Reference Operator Project Name Quad/Block Direction Issued
PRA/6 Perenco UK Ltd Davy East Field Increase in Production 53/05 04/09/2019
PRA/6 Perenco UK Ltd Boyle Field Increase in Production 49/30 04/09/2019
PRA/6 Perenco UK Ltd Brown Field Increase in Production 49/30 04/09/2019
PRA/272 Ithaca Energy (UK) Ltd Stella North Drill Centre Manifold Increase in Production 30/06 12/09/2019
PRA/189 Perenco UK Ltd Galahad Field Increase in Production 48/12 13/09/2019
PRA/29 Perenco UK Ltd Mercury Field Increase in Production 47/09 17/09/2019
PRA/84 Shell U.K. Ltd Brigantine A Increase in production 49/26 16/09/2019
PRA/143 BP Exploration Operating Co Ltd Madoes Field Increase in Production 22/23 20/09/2019
PRA/15 Total E&P UK Ltd Alwyn North Increase in Production 03/09 27/09/2019
PRA/15 Total E&P UK Ltd Grant Field Increase in Production 03/15 30/09/2019
PRA/15 Total E&P UK Ltd Islay Field Increase in Production 03/15 30/09/2019
PRA/15 Total E&P UK Ltd Nuggets N4 Increase in Production 03/19 30/09/2019
PRA/41 CNR International (U.K.) Ltd Ninian South Increase in Production 03/08 27/09/2019
PRA/42 Dana Petroleum (E&P) Ltd Bittern Field Increase in Production 21/30 03/9/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions.  Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increase is as specified in the application.

Having regard to the relevant application(s) for direction(s) submitted under the above Regulations, the Secretary of State has assessed the project(s) as not likely to have a significant effect on the environment and has given a direction that the application for consent under the Petroleum Act 1998 need not be accompanied by an environmental statement. The main reasons and considerations on which this decision is based are summarised above and have taken full account of the characteristics of the project, the environmental sensitivity of the areas likely to be affected by the project and the nature and significance of the potential impacts, as set out in Schedule 1 to the Regulations. 

Excluded Activities

Pursuant to regulation 5(10) of the above Regulations, the Secretary of State gives notice that, having regard to the matters set out in regulations 5(2) and/or 5(2A) and Schedule 1 to the Regulations, the Secretary of State has decided that the operations in respect of which consent is sought would not be likely to have a significant effect on the environment and accordingly no environmental statement need be prepared in respect of the relevant project. 

Reference Operator Project Name Quad/ Block Exclusion Date
EX-59-2019 Apache Beryl Limited Buckland PL4435 remediation 09/18 02/09/2019
EX-62-2019 Perenco UK Limited Whittle jumper installation PLU4774 42/28 06/09/2019
EX-63-2019 Perenco UK Limited Mercury jumper installation PLU4777 47/09 06/09/2019
EX-65-2019 Perenco UK Limited Wollaston pipeline support PL1929 42/28 12/09/2019
EX-64-2019 Perenco UK Limited Newsham jumper installation PLU4848 48/07 13/09/2019
EX-66-2019 Premier Oil UK Limited Balmoral control umbilical replacement 16/21 19/08/2019
EX-68-2019 Petrofac Facilities Management Limited Guillemot A umbilical replacement and stab plate recovery. 21/25, 21/30 30/09/2019
EX-69-2019 Equinor UK Limited Utgard Production Extension 16/18 03/09/2019
EX-70-2019 Premier Oil E&P UK Limited Catcher Production Extension 28/09 03/09/2019
EX-71-2019 Shell U.K. Limited Starling Production Extension 29/03 03/09/2019

Further information in relation to all the decisions detailed in this notice can be found on the GOV.UK website at:   

https://www.gov.uk/guidance/oil-and-gas-environmental-data.  

  If you have any questions in relation to this notice or the decisions, please contact the Environmental Management Team, Offshore Petroleum Regulator for Environment and Decommissioning (OPRED), AB1 Building, Crimon Place, Aberdeen AB10 1BJ (e-mail: emt@beis.gov.uk).