Pipe-Lines
PETROLEUM ACT 1998
NOTICE OF THE ISSUE OF A SUBMARINE PIPELINE WORKS AUTHORISATION
The North Sea Transition Authority gives notice that it has decided to issue, and in consequence has issued, a works authorisation to be held by Ithaca Energy (UK) Limited whose address is 13 Queen’s Road, Aberdeen, AB15 4YL for the construction and use of a pipeline system between the BLPA Subsea Umbilical Distribution Structure (SUDS) – Riser UTA and the Area B Drill Centre – Electrical Distribution Unit (EDU).
The North Sea Transition Authority (NSTA) is the business name of the Oil and Gas Authority (OGA). The OGA remains the legal name of the company. References in this notice to the NSTA should be interpreted as the OGA.
Except with the consent of the NSTA, the 103.2 Millimetre umbilical pipeline shall only be used to convey electrical power and signal. The pipelines may be used by the Holder and with the Holder's agreement, and with the consent of the NSTA, by other persons. Ithaca Energy (UK) Limited have been appointed operator of the pipelines.
David Reaich
The Oil and Gas Authority