Pipe-Lines
PETROLEUM ACT 1998
NOTICE OF THE ISSUE OF A SUBMARINE
PIPELINE WORKS AUTHORISATION
The Oil and Gas Authority gives notice that it has decided to issue, and in consequence has issued, a works authorisation to be held by Ithaca Energy (UK) Limited whose address is 13 Queen’s Road, Aberdeen, AB15 4YL for the construction and use of a pipeline system between the Stella FPF-1 and the Vorlich North Well and the Stella FPF-1 and the Vorlich South Well, in connection with the Vorlich field.
Except with the consent of the Oil and Gas Authority, the 323.9 Millimetre Production pipeline shall only be used to convey Produced Fluids; the 168.3 Millimetre Production Jumper pipelines shall only be used to convey Produced Fluids; the Umbilical pipeline shall only be used to convey Hydraulics, Electrics and Chemicals and the Umbilical Jumper pipelines shall only be used to convery Hydraulics, Electrics and Chemicals.
The pipelines may be used by the Holder and with the Holder's agreement, and with the consent of the Oil and Gas Authority, by other persons.
Ithaca Energy (UK) Limited have been appointed operator of the pipelines.
CLAIRE GRANT
Oil and Gas Authority