Pipe-Lines
PETROLEUM ACT 1998
NOTICE OF THE ISSUE OF A SUBMARINE
PIPELINE WORKS AUTHORISATION
The Oil and Gas Authority gives notice that it has decided to issue, and in consequence has issued, a works authorisation to be held by Ithaca Energy (UK) Limited whose address is 13 Queen’s Road, Aberdeen, AB15 4YL for the construction and use of a system of pipelines between the Cook Manifold and the Tee Piece at Teal Riser Base in connection with the Cook Field.
Except with the consent of the Oil and Gas Authority, the 219.1 Millimetre Water Injection pipeline shall only be used to convey Deoxygenated Seawater; and the Umbilical shall only be used to convey hydraulic and electrical.
The pipelines may be used by the Holder and with the Holder's agreement, and with the consent of the Oil and Gas Authority, by other persons.
Ithaca Energy (UK) Limited have been appointed operator of the pipelines.
CLAIRE GRANT
Oil and Gas Authority