Pipe-Lines
Offshore Petroleum Regulator for Environment and Decommissioning
THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED)
DIRECTION DECISIONS
Pursuant to regulations 6(11) and 6(12) of the above Regulations, the Secretary of State gives notice of the following decision(s), in respect of application(s) made under regulation 6 of the above Regulations requesting a direction confirming that a relevant project need not be accompanied by an environmental statement and confirming the Secretary of State’s agreement to the grant of consent.
Reference | Operator | Project Name | Quad/ Block | Direction Issued |
DRA/725 | CNR International (U.K.) Limited | Lisa - Ninian South S82RD Well | 03/08 | 12/11/2019 |
Main reasons / conclusions on which decision is based | Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to marine environment, and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant. | |||
Mitigation features / measures | Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal. Appropriate controls will be in place to reduce the likelihood of accidental events. |
Reference | Operator | Project Name | Quad/ Block | Direction Issued |
DRA/743 | Apache Beryl I Limited | Solar Exploration Well | 09/18 | 06/11/2019 |
DRA/700 | Petrofac Facilities Management Limited | Liberator LA-03 Appraisal Well | 13/23 | 07/11/2019 |
DRA/738 | Shell U.K. Ltd | Gannet F Development Well | 21/30 | 20/11/2019 |
DRA/745 | Spirit Energy North Sea Oil Limited | Chestnut EN 1 Well | 22/02 | 22/11/2019 |
DRA/716 | Shell U.K. Ltd | Fram G3 Development Well | 29/03 | 25/11/2019 |
Main reasons / conclusions on which decision is based | Main considerations related to marine discharges, atmospheric emissions and interference with other users of the sea. Discharges assessed as no risk to marine environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant. | |||
Mitigation features / measures | Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal, and works will be undertaken in accordance with applicable navigational conditions. Appropriate controls will be in place to reduce the likelihood of accidental events. |
Reference | Operator | Project Name | Quad/Block | Direction Issued |
PLA/706 | Perenco UK Limited | PL24 Pipeline Deposits | 49/27, 53/1, 52/5, 52/3 | 08/11/2019 |
PLA/707 | Perenco UK Limited | PL22 Pipeline Deposits | 49/23, 49/23, 49 27, 49/27, 49/27, 49/28 | 21/11/2019 |
PLA/708 | Perenco UK Limited | PL23 Pipeline Deposits | 49/26 | 20/11/2019 |
PLA/709 | Perenco UK Limited | PL253 Pipeline Deposits | 49/24 & 49/29 | 15/11/2019 |
PLA/656 | Shell U.K. Ltd | Arran Pipeline Works Deposits | 23/16, 23/21,22/25 & 22/30 | 21/11/2019 |
Main reasons / conclusions on which decision is based | Main considerations related to deposit of materials on the seabed and interference with other users of the sea. Impacts assessed as localised and not significant. | |||
Mitigation features / measures | Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application. |
Reference | Operator | Project Name | Quad/Block | Direction Issued |
PLA/656 | Shell U.K. Ltd | Arran Pipeline Works | 23/16, 23/21,22/25 & 22/30 | 21/11/2019 |
Main reasons / conclusions on which decision is based | Main considerations related to installation of infrastructure and associated deposit of materials on the seabed, and interference with other users of the sea. Impacts assessed as localised and not significant. | |||
Mitigation features / measures | Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application. |
Reference | Operator | Project Name | Quad/ Block | Direction Issued |
PRA/52 | Shell U.K. Ltd | Fram Field Commencement of Production | 29/03 | 06/11/2019 |
PRA/278 | Equinor UK Ltd | Barnacle Field Commencement of Production | 211/30 | 01/11/2019 |
Main reasons / conclusions on which decision is based | Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant. | |||
Mitigation features/measures | Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increases are as specified in the application. |
Reference | Operator | Project Name | Quad/Block | Direction Issued |
PRA/24 | Chrysaor North Sea Limited | Hawkins Field Increase in Production | 22/05 | 23/07/2019 |
PRA/43 | Apache Beryl I Limited | Buckland Field Increase in Production | 09/13 | 13/11/2019 |
PRA/88 | Repsol Sinopec Resources UK LTD | Orion Field Increase in Production | 30/18 | 05/11/2019 |
PRA/36 | Repsol Sinopec Resources UK LTD | Tartan Field Increase in Production | 15/16 | 15/11/2019 |
PRA/36 | Repsol Sinopec Resources UK LTD | Galley Field Increase in Production | 15/23 | 15/11/2019 |
PRA/82 | Perenco UK Limited | Trent Field Increase in Production | 43/24 | 14/11/2019 |
PRA/20 | Rockrose UKCS8 LLC | East Brae Field Increase in Production | 16/03 | 28/11/2019 |
PRA/69 | BP Exploration Operating Co Ltd | Arundel Field Increase in Production | 16/23 | 28/11/2019 |
Main reasons / conclusions on which decision is based | Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant. | |||
Mitigation features / measures | Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increase is as specified in the application. |
Having regard to the relevant application(s) for direction(s) submitted under the above Regulations, the Secretary of State has assessed the project(s) as not likely to have a significant effect on the environment and has given a direction that the application for consent under the Petroleum Act 1998 need not be accompanied by an environmental statement. The main reasons and considerations on which this decision is based are summarised above and have taken full account of the characteristics of the project, the environmental sensitivity of the areas likely to be affected by the project and the nature and significance of the potential impacts, as set out in Schedule 1 to the Regulations.
Excluded Activities
Pursuant to regulation 5(10) of the above Regulations, the Secretary of State gives notice that, having regard to the matters set out in regulations 5(2) and/or 5(2A) and Schedule 1 to the Regulations, the Secretary of State has decided that the operations in respect of which consent is sought would not be likely to have a significant effect on the environment and accordingly no environmental statement need be prepared in respect of the relevant project.
Reference | Operator | Project Name | Quad/ Block |
EX-126-2019 | BP Exploration Operating Co Ltd | Schiehallion PLU3349 Choke Diagnostics Deposits | 204/20 |
EX-127-2019 | BP Exploration Operating Co Ltd | Schiehallion PLU2180 Water Injection Choke Diagnostics Deposits | 204/20 |
EX-128-2019 | BP Exploration Operating Co Ltd | Schiehallion PLU2181 Choke Diagnostics Deposits | 204/20 |
EX-129-2019 | RockRose UKCS8 LLC | Brae South Production Extension | 16/07 |
EX-130-2019 | Spirit Energy North Sea Limited | Chiswick Production Extension | 49/04 |
EX-131-2019 | RockRose UKCS8 LLC | East Brae Production Extension | 16/03 |
EX-132-2019 | Repsol Sinopec North Sea Limited | Enoch Production Extension | 21/05 |
EX-133-2019 | INEOS UK SNS Limited | Clipper South Production Extension | 48/19 |
EX-134-2019 | One-Dyas UK Limited | East Sean Production Extension | 49/25 |
EX-135-2019 | Spirit Energy Southern North Sea Limited | Babbage Production Extension | 48/02 |
EX-136-2019 | Spirit Energy Resources Limited | Statjford Production Extension | 211/25 |
EX-137-2019 | Chrysaor Petroleum Company U.K. Limited | Joanne Production Extension | 30/07 |
EX-138-2019 | Perenco UK Limited | Leman South Production Extension | 53/02 |
EX-139-2019 | Apache North Sea Limited | Bacchus Production Extension | 22/06 |
EX-140-2019 | CNOOC Petroleum Europe Limited | Telford Production Extension | 15/22 |
EX-141-2019 | CNOOC Petroleum Europe Limited | Scott Production Extension | 15/22 |
EX-142-2019 | CNOOC Petroleum Europe Limited | Rochelle Production Extension | 15/27 |
EX-143-2019 | Repsol Sinopec Resources UK Limited | Medwin Production Extension | 30/17 |
EX-144-2019 | Repsol Sinopec Resources UK Limited | Leven Production Extension | 30/17 |
EX-145-2019 | Repsol Sinopec Resources UK Limited | Clyde Production Extension | 30/17 |
EX-146-2019 | Total E&P North Sea UK Limited | Gryphon Production Extension | 09/18 |
EX-147-2019 | Shell U.K. Limited | Shearwater Production Extension | 22/30 |
EX-148-2019 | Shell U.K. Limited | Scoter Production Extension | 22/30 |
EX-149-2019 | Shell U.K. Limited | Merganser Production Extension | 22/30 |
EX-150-2019 | Neptune E&P UKCS Limited | Orca Production Extension | 44/24 |
EX-151-2019 | Total E&P North Sea UK Limited | Balloch Production Extension | 15/20 |
EX-152-2019 | Total E&P North Sea UK Limited | Lochranza Production Extension | 15/20 |
EX-153-2019 | Repsol Sinopec Resources UK Limited | Tweedsmuir Production Extension | 21/01 |
Further information in relation to all the decisions detailed in this notice can be found on the GOV.UK website at:
https://www.gov.uk/guidance/oil-and-gas-environmental-data.
If you have any questions in relation to this notice or the decisions, please contact the Environmental Management Team, Offshore Petroleum Regulator for Environment and Decommissioning (OPRED), AB1 Building, Crimon Place, Aberdeen AB10 1BJ (e-mail: emt@beis.gov.uk).