Transport Acts
Department for Transport
TRANSPORT AND WORKS ACT 1992
The Secretary of State for Transport gives notice pursuant to section 14(1)(b) of
the Transport and Works Act 1992 (“the Act”) that he has determined under section
13(1) of the Act to make with modifications the Midland Metro (Birmingham City Centre
Extension, etc.) Order.
The Order was applied for by the West Midlands Passenger Transport Executive (known
as Centro), Centro House, 16 Summer Lane, Birmingham B19 3SD.
The Order will authorise Centro to construct and operate a 3.2 kilometre extension
to the Midland Metro light rapid transit system, running from Snow Hill to Edgbaston,
via Birmingham City Centre.
In making this determination, the Secretary of State has complied with the requirements
of paragraphs (a) to (c) of section 14(3A) of the Act about consideration of the environmental
statement and of representations relating to it. For the purposes of section 14(3AA)
of the Act he confirms that the main measures to avoid, reduce and, if possible, remedy
any major adverse environmental effects are those set out in the conditions that he
intends to attach to the deemed planning permission and in the Code of Construction
Practice, referred to in his decision letter.
Copies of the letter setting out the full terms of the Secretary of State’s determination
may be obtained from the Department for Transport, TWA Orders Unit, 9th Floor Southside,
105 Victoria Street, London SW1E 6DT. Copies of the Order (once made) may be obtained
from The Stationery Office Limited or through booksellers.
E Harvey, Head of the TWA Orders Unit, Department for Transport, 9th Floor Southside, 105
Victoria Street, London SW1E 6DT.