Electricity

2017-09-012016-09-23TSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211, customer.services@tso.co.uk26170877878

Wheelhouse Energy (NI) Limited

Company Number: NI 073607

Registered at: Greenwood House, 64 Newforge Lane, Belfast, BT9 5NF

APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE 10(1)(A) OF THE ELECTRICITY (NI) ORDER 1992 AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER 2003

Has applied to the Utility regulator of Northern Ireland for an electricity generation license commencing September 2017 and consisting of the following.

Nine wind turbine generators at a rating of 2.35MW each to be connected to the Electricity Grid in Northern Ireland. The wind farm will be constructed 630m east of 115 Longmore Road, Broughshane, Co. Antrim. BT43 7HR

Copies of the maps are available for inspection by the public at the Northern Ireland Authority for Utility Regulation, Queens House, 14 Queen Street, BELFAST BT1 6ED between 10.00am and 4.00pm on any working day.

Full name of the applicant: Wheelhouse Energy (NI) Limited

Address of the applicant(s) or, in the case of a body corporate, the registered or principal office.

Greenwood House, 64 Newforge Lane, Belfast, Co. Antrim. BT9 5NF

Where the applicant is a company, the full names of the current Directors and the company’s registered number.

Directors of Wheelhouse Energy (NI) Limited are Peter Baillie, Anthony Hegarty, David Macartney and Desmond George.

Company Registration No: NI 073607

Where a holding of 20 per cent, or more of the shares (see Note) of an applicant is held by a body corporate or partnership or an incorporated association carrying on a trade or business with or without a view to profit, the name(s) and address(es) of the holder(s) of such shares shall be provided.

Not Applicable

Desired date from which the licence is to take effect. 1st September 2017

The number of generating stations intended to be operated under the licence (if granted). 1

A sufficient description specifying the actual or proposed locations of those stations. E.g.: by reference to townlands, local government districts, postal address, etc.

630m east of 115 Longmore Road, Broughshane, Co. Antrim. BT43 7HR

A description of how those stations will, in each case, be fuelled or driven. Wind

The date when any proposed generating stations are expected to be commissioned. Q3/Q4 2017

The capacity and type of each unit within the generating station (MW).

9 wind turbine generators each rated 2.35MW, e.g. Enercon E82-E4-2.35MW

Details of any licences held, applied for or being applied for by the applicant in respect of the generation, participation in transmission or supply of electricity.

Planning Consented Reference: D/2011/0162/F

Electricity Connection Agreement

Article 39 Construction Licence

TUoS Agreement