Pipe-Lines

Petroleum Act 19982019-01-032019-01-072019-01-092019-01-102019-01-112019-01-152019-01-162019-01-172019-01-212019-01-302019-01-312019-03-112019-03-12TSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211, customer.services@tso.co.uk322879828155

THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED)

ENVIRONMENTAL STATEMENT DECISIONS

Pursuant to regulations 5A(7) and 5A(8) of the above Regulations, the Secretary of State gives notice of the following decision(s) in respect of the Secretary of State’s agreement to the grant of consent in relation to a relevant project under regulation 5A(1)(c) of the above Regulations.

Reference Operator Project Name Quad / Block Decision Issued
D/4224/2018 Neptune E&P UK Ltd Seagull Field Development 22/24, 22/29 21/01/2019
Summary of representations received Consultees confirmed no objections and no representations were received in response to the public notice.
Main reasons / conclusions on which decision is based Main considerations related to the physical impact of installed infrastructure, marine discharges and atmospheric emissions, but impacts were assessed as localised and not significant.
Relevant mitigation measures, environmental conditions or monitoring conditions attached to decision Appropriate controls will be put in in place to reduce the likelihood of accidental events. Agreement to the issue of consent is conditional upon all works being undertaken as detailed in the Environmental Statement. No additional environmental / monitoring conditions were attached to the decision.

Having regard to the Environmental Statement(s) submitted under the above Regulations, any information provided under regulation 10 of these Regulations and any representations received, the Secretary of State has assessed the project(s) as not likely to have a significant effect on the environment and has agreed to the grant of consent under the Petroleum Act 1998.

Direction Decisions

Pursuant to regulations 6(11) and 6(12) of the above Regulations, the Secretary of State gives notice of the following decision(s), in respect of application(s) made under regulation 6 of the above Regulations requesting a direction confirming that a relevant project need not be accompanied by an environmental statement and confirming the Secretary of State’s agreement to the grant of consent.

Reference Operator Project Name Quad/ Block Direction Issued
DRA/635 Nexen Petroleum UK Ltd Buzzard SP20 Development Well 20/06 07/01/2019
DRA/636 CNR International UK Ltd Ninian S56 Development Well 03/08 10/01/2019
DRA/632 Chevron North Sea Ltd Captain Development Well 13/22 31/01/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to marine environment, and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Any cuttings contaminated with oil-based mud or reservoir hydrocarbons will be treated offshore prior to discharge or shipped to shore for treatment and disposal. Appropriate controls will be in place to reduce the likelihood of accidental events.
Reference Operator Project Name Quad/ Block Direction Issued
DRA/608 Apache Beryl I Ltd Buckland Development Well 09/18 09/01/2019
DRA/599 Equinor UK Ltd Bigfoot Exploration Well 09/22 11/01/2019
DRA/621 Repsol Sinopec Resources UK Ltd Shaw Development Well Re-drill 22/22 11/01/2019
DRA/548 Fraser Well Management Ltd Colter Appraisal Well 98/11 17/01/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges, atmospheric emissions and interference with other users of the sea. Discharges assessed as no risk to marine environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal, and works will be undertaken in accordance with applicable navigational conditions. Appropriate controls will be in place to reduce the likelihood of accidental events.
Reference Operator Project Name Quad/Block Direction Issued
PLA/496 ENI UK Ltd Pipeline Stabilisation Works 48/29 11/01/2019
PLA/638 ENI UK Ltd Pipeline Stabilisation Works 48/29 30/01/2019
PLA/640 ENI UK Ltd Pipeline Stabilisation Works 48/30, 48/29 31/01/2019
Main reasons / conclusions on which decision is based Main considerations related to deposit of materials on the seabed and interference with other users of the sea. Impacts assessed as localised and not significant.
Mitigation features / measures Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/Block Direction Issued
PLA/490 Shell UK Ltd Brent Charlie Gas Export Pipeline and Brent Bypass Phase 2 211/29 03/01/2019
PLA/618 CNOOC Petroleum Europe Ltd Scott Water Injection Flowline PL4567 15/22 31/01/2019
Main reasons / conclusions on which decision is based Main considerations related to installation of infrastructure and associated deposit of materials on the seabed, and interference with other users of the sea. Impacts assessed as localised and not significant.
Mitigation features / measures Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/ Block Direction Issued
PRA/200 Decipher Production Ltd Orlando Field Commencement of Production 03/03 16/01/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features/measures Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increases are as specified in the application.
Reference Operator Project Name Quad/Block Direction Issued
PRA/63 Perenco UK Ltd West Sole Field Increase in Production 48/06 09/01/2019
PRA/29 Perenco UK Ltd Ravenspurn South Field Increase in Production 42/30 10/01/2019
PRA/29 Perenco UK Ltd Mercury Field Increase in Production 47/9 10/01/2019
PRA/29 Perenco UK Ltd Apollo Field Increase in Production 47/3 10/01/2019
PRA/29 Perenco UK Ltd Neptune Field Increase in Production 47/4 10/01/2019
PRA/188 Perenco Gas UK Limited Malory Field Increase in Production 48/12 10/01/2019
PRA/76 Perenco UK Ltd Waveney Field Increase in Production 48/17 10/01/2019
PRA/97 Perenco Gas UK Limited Mordred Field Increase in Production 48/12 10/01/2019
PRA/187 Perenco Gas UK Limited Excalibur Field Increase in Production 48/17 10/01/2019
PRA/97 Perenco Gas UK Limited Lancelot Field Increase in Production 48/17 11/01/2019
PRA/6 Perenco UK Ltd Indefatigable Field Increase in Production 49/18 15/01/2019
PRA/6 Perenco UK Ltd Indefatigable SW Field Increase in Production 49/23 15/01/2019
PRA/6 Perenco UK Ltd Baird Field Increase in Production 49/23 15/01/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions.  Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increase is as specified in the application.

Having regard to the relevant application(s) for direction(s) submitted under the above Regulations, the Secretary of State has assessed the project(s) as not likely to have a significant effect on the environment and has given a direction that the application for consent under the Petroleum Act 1998 need not be accompanied by an Environmental Statement. The main reasons and considerations on which this decision is based are summarised above and have taken full account of the characteristics of the project, the environmental sensitivity of the areas likely to be affected by the project and the nature and significance of the potential impacts, as set out in Schedule 1 to the Regulations.

Excluded Activities

Pursuant to regulation 5(10) of the above Regulations, the Secretary of State gives notice that, having regard to the matters set out in regulations 5(2) and/or 5(2A) and Schedule 1 to the Regulations, the Secretary of State has decided that the operations in respect of which consent is sought would not be likely to have a significant effect on the environment and accordingly no environmental statement need be prepared in respect of the relevant project.

Reference Operator Project Name Quad/ Block
EX-01-2019 Apache Beryl I Ltd Garten Field Pipeline Works 09/18
EX-02-2019 Perenco UK Ltd NW Bell Pipeline Works 49/23
EX-03-2019 Dana E&P UK Ltd Pict Field Production Extension 21/23

Further information in relation to all the decisions detailed in this notice can be found on the GOV.UK website at:

https://www.gov.uk/guidance/oil-and-gas-environmental-data.

If you have any questions in relation to this notice or the decisions, please contact the Environmental Management Team, Offshore Petroleum Regulator for Environment and Decommissioning (OPRED), AB1 Building, Crimon Place, Aberdeen AB10 1BJ (e-mail: emt@beis.gov.uk).