Petroleum Act 19982019-04-182019-04-302019-05-012019-05-022019-05-032019-05-132019-05-142019-05-152019-05-162019-05-172019-05-222019-05-272019-05-292019-05-302019-05-312019-06-102019-06-11TSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211, customer.services@tso.co.uk329983128193

THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED)

DIRECTION DECISIONS

Pursuant to regulations 6(11) and 6(12) of the above Regulations, the Secretary of State gives notice of the following decision(s), in respect of application(s) made under regulation 6 of the above Regulations requesting a direction confirming that a relevant project need not be accompanied by an environmental statement and confirming the Secretary of State’s agreement to the grant of consent.

Reference Operator Project Name Quad/ Block Direction Issued
DRA/684 CNOOC Petroleum Europe Ltd Scott ST73 Development Well 15/22 03/05/2019
DRA/692 Apache North Sea Ltd Forties Delta Well 21/10-D33Z 21/10 14/05/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to marine environment, and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal. Appropriate controls will be in place to reduce the likelihood of accidental events.
Reference Operator Project Name Quad/ Block Direction Issued
DRA/650 ONE-DYAS UK Ltd Darach Central 1 Well 42/04 02/05/2019
DRA/689 Petrofac Facilities Management Ltd Lyon 2 Exploration Well 208/02 13/05/2019
DRA/633 BP Exploration Operating Co Ltd Vorlich North Development Well 30/01 16/05/2019
DRA/634 BP Exploration Operating Co Ltd Vorlich South Development Well 30/01 17/05/2019
DRA/691 Petrofac Facilities Management Ltd Guillemot A Development Well 21/25 15/05/2019
DRA/647 Shell U.K. Ltd Penguins PAN-N Well 211/13 27/05/2019
DRA/648 Shell U.K. Ltd Penguins East DT-04 Well 211/13 03/05/2019
DRA/652 Shell U.K. Ltd Penguins Rockhopper Well 211/13 13/05/2019
DRA/591 Chrysaor North Sea Ltd Hawkins well 22/05 30/04/2019
DRA/655 Chrysaor North Sea Ltd Seymour well 22/05 30/04/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges, atmospheric emissions and interference with other users of the sea. Discharges assessed as no risk to marine environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal, and works will be undertaken in accordance with applicable navigational conditions.  Appropriate controls will be in place to reduce the likelihood of accidental events.
Reference Operator Project Name Quad/Block Direction Issued
PLA/666 BP Exploration Operating Co Ltd Clair Export Line Rock Placement 206/08, 207/09 31/05/2019
Main reasons / conclusions on which decision is based Main considerations related to deposit of materials on the seabed and interference with other users of the sea. Impacts assessed as localised and not significant.
Mitigation features / measures Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/Block Direction Issued
PLA/617 Shell U.K. Ltd Fram subsea infrastructure installation 29/03, 29/08, 29/04, 29/09 22/05/2019
PLA/660 Ithaca Energy (UK) Ltd Installation of the new Cook Water Injection pipeline 21/25, 21/20 22/05/2019
PLA/646 Ithaca Energy (UK) Ltd Vorlich Pipeline Installation 30/01, 30/06 01/05/2019
Main reasons / conclusions on which decision is based Main considerations related to installation of infrastructure and associated deposit of materials on the seabed, and interference with other users of the sea. Impacts assessed as localised and not significant.
Mitigation features / measures Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/Block Direction Issued
PLA/663 CNOOC Petroleum Europe Ltd Scott EWIM/WWIM Project 15/22 30/05/2019
Main reasons / conclusions on which decision is based Main considerations related to installation of infrastructure and associated deposit of materials on the seabed, marine discharges and interference with other users of the sea.  Discharges assessed as no risk to the marine environment, and impacts assessed as localised and not significant.
Mitigation features / measures Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/ Block Direction Issued
PRA/182 Equinor UK Ltd Mariner Field Commencement of Production 09/11 14/05/2019
PRA/20 Marathon Oil UK LLC Braemar Field Production Increase 16/03 29/05/2019
PRA/121 INEOS UK SNS Ltd Clipper South Production Increase 48/19 18/04/2019
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features/measures Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increases are as specified in the application.

Having regard to the relevant application(s) for direction(s) submitted under the above Regulations, the Secretary of State has assessed the project(s) as not likely to have a significant effect on the environment and has given a direction that the application for consent under the Petroleum Act 1998 need not be accompanied by an environmental statement. The main reasons and considerations on which this decision is based are summarised above and have taken full account of the characteristics of the project, the environmental sensitivity of the areas likely to be affected by the project and the nature and significance of the potential impacts, as set out in Schedule 1 to the Regulations.

Excluded Activities

Pursuant to regulation 5(10) of the above Regulations, the Secretary of State gives notice that, having regard to the matters set out in regulations 5(2) and/or 5(2A) and Schedule 1 to the Regulations, the Secretary of State has decided that the operations in respect of which consent is sought would not be likely to have a significant effect on the environment and accordingly no environmental statement need be prepared in respect of the relevant project.

Reference Operator Project Name Quad/ Block
EX-19-2019 Shell U.K. Ltd Pierce A6 Options Case – Jumper Change-out 23/22
EX-20-2019 BP Exploration Operating Co Ltd Schiehallion NW03 Water Injection Choke Project 204/20
EX-21-2019 BP Exploration Operating Co Ltd Madoes W154 Scour Remediation 22/23
EX-22-2019 Dana Petroleum (E&P) Ltd Guillemot West and NW Development- riser base scour protection 21/30
EX-23-2019 Dana Petroleum (E&P) Ltd Bittern Development- riser base scour protection 21/30
EX-24-2019 Dana Petroleum (E&P) Ltd Triton to DC6- riser base scour protection 21/30
EX-25-2019 Spirit Energy North Sea Ltd Chestnut Field Production Extension 22/02
EX-26-2019 Spirit Energy North Sea Ltd Markham Field Production Extension 49/05
EX-27-2019 Neptune E&P UKCS Ltd Orca Field Production Extension 44/24
EX-28-2019 Spirit Energy North Sea Ltd Kew Field Production Extension 49/04
EX-29-2019 Spirit Energy North Sea Ltd Babbage Field Production Extension 48/02
EX-30-2019 Perenco Gas (UK) Ltd Excalibur Field Production Extension 48/17
EX-31-2019 Perenco Gas (UK) Ltd Lancelot Field Production Extension 48/17
EX-32-2019 Perenco Gas (UK) Ltd Malory Field Production Extension 48/12
EX-33-2019 Spirit Energy North Sea Ltd Chiswick Field Production Extension 49/04
EX-34-2019 Shell U.K. Ltd Clipper North Field Production Extension 48/19

Further information in relation to all the decisions detailed in this notice can be found on the GOV.UK website at:

https://www.gov.uk/guidance/oil-and-gas-environmental-data.

If you have any questions in relation to this notice or the decisions, please contact the Environmental Management Team, Offshore Petroleum Regulator for Environment and Decommissioning (OPRED), AB1 Building, Crimon Place, Aberdeen AB10 1BJ (e-mail: emt@beis.gov.uk).