Pipe-Lines

PETROLEUM ACT 19982019-08-122019-08-13TSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211, customer.services@tso.co.uk336541428220

PETROLEUM ACT 1998

NOTICE OF THE ISSUE OF A SUBMARINE

PIPELINE WORKS AUTHORISATION

The Oil and Gas Authority gives notice that it has decided to issue, and in consequence has issued, a works authorisation to be held by Zennor Pathway Limited whose address is First Floor, Hays House, Millmead, Guildford, Surrey, GU24HJ for the construction and use of a system pipelines between the Finlaggan Well F1H and the Britannia Platform and the Finlaggan Well F2H and the Britannia Platform in connection with the Finlaggan Field.

Except with the consent of the Oil and Gas Authority, the 168.3 Millimetre Production pipelines shall only be used to convey Produced Fluids; the 273.1 Millimetre Production pipeline shall only be used to convey Produced Fluids; the Umbilicals shall only be used to convey Hydraulics, Scale Inhibitor, Chemical Spare, Corrosion Inhibitor, Methanol, Signal Spare, P & T Transmitter, Position Transmitter, P Transmitter, Power, Signal and Electrics.

The pipelines may be used by the Holder and with the Holder's agreement, and with the consent of the Oil and Gas Authority, by other persons.

Zennor Pathway Limited have been appointed operator of the pipelines.

GAVIN ROSS

Oil and Gas Authority