Pipe-Lines

Petroleum Act 19982020-09-012020-09-022020-09-082020-09-112020-09-142020-09-152020-09-162020-09-172020-09-182020-09-212020-09-292020-10-16TSO (The Stationery Office), customer.services@thegazette.co.uk365625263149

OFFSHORE PETROLEUM REGULATOR FOR ENVIRONMENT AND DECOMMISSIONING

THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED)

DIRECTION DECISIONS

Pursuant to regulations 6(11) and 6(12) of the above Regulations, the Secretary of State gives notice of the following decision(s), in respect of application(s) made under regulation 6 of the above Regulations requesting a direction confirming that a relevant project need not be accompanied by an environmental statement and confirming the Secretary of State’s agreement to the grant of consent.

Reference Operator Project Name Quad/ Block Direction Issued
DRA/825 CNOOC Petroleum Europe Ltd Golden Eagle Infill Well 20/01a – HPJ 20/01 08/09/2020
DRA/808 Premier Oil E&P UK Ltd Tolmount SE well 42/28 15/09/2020
DRA/810 Premier Oil E&P UK Ltd Tolmount SW well 42/28 15/09/2020
DRA/811 Premier Oil E&P UK Ltd Tolmount NE well 42/28 15/09/2020
DRA/812 Premier Oil E&P UK Ltd Tolmount NW well 42/28 15/09/2020
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to marine environment, and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal. Appropriate controls will be in place to reduce the likelihood of accidental events.
Reference Operator Project Name Quad/ Block Direction Issued
DRA/841 Total E&P North Sea UK Ltd Culzean C7z Well Perforation 22/25 18/09/2020
DRA/833 Total E&P North Sea UK Ltd Culzean C1 Well Completion 22/25 29/09/2020
Main reasons / conclusions on which decision is based Main considerations related to marine discharges, atmospheric emissions and interference with other users of the sea. Discharges assessed as no risk to marine environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal, and works will be undertaken in accordance with applicable navigational conditions. Appropriate controls will be in place to reduce the likelihood of accidental events.
Reference Operator Project Name Quad/ Block Direction Issued
PLA/769 IOG North Sea Ltd Elgood Production Pipeline 48/22 & 48/23 17/09/2020
Main reasons / conclusions on which decision is based Main considerations related to seabed excavation operations and deposit of materials on the seabed. Impacts assessed as localised and not significant.
Mitigation features / measures Excavations and deposits will be the minimum required to achieve objectives, and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/Block Direction Issued
PLA/741 BP Exploration Operating Co. Ltd ETAP and Egret Pipeline Works 22/24 02/09/2020
Main reasons / conclusions on which decision is based Main considerations related to installation of infrastructure and associated deposit of materials on the seabed, and marine discharges. Discharges assessed as no risk to the marine environment, and impacts assessed as localised and not significant.
Mitigation features / measures Deposits will be the minimum required to achieve objectives and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application.
Reference Operator Project Name Quad/Block Direction Issued
PRA/35 Chrysaor Petroleum Co. UK Ltd Jade Field Production Increase 30/07 08/09/2020
PRA/53 Shell U.K. Ltd Gannet B Field Increase in Production 21/25 11/09/2020
PRA/53 Shell U.K. Ltd Gannet D Field Increase in Production 21/25 11/09/2020
PRA/167 Total E&P UK Ltd Franklin Field Increase in Production 29/5 14/09/2020
PRA/141 Total E&P UK Ltd Elgin Field Increase in Production 22/30 15/09/2020
PRA/81 Spirit Energy Production UK Ltd Millom Field Increase in Production 110/02 16/09/2020
PRA/93 Apache North Sea Ltd Tonto Field Increase in Production 21/10 17/09/2020
PRA/157 Premier Oil UK Ltd Solan Field Increase in Production 205/26 21/09/2020
PRA/88 Repsol Sinopec Resources UK Ltd Clyde Field Increase in Production 30/17 16/09/2020
PRA/155 BP Exploration Operating Co. Ltd Alligin Field Increase in Production 204/20 01/09/2020
Main reasons / conclusions on which decision is based Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant.
Mitigation features / measures Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increase is as specified in the application.

Having regard to the relevant application(s) for direction(s) submitted under the above Regulations, the Secretary of State has assessed the project(s) as not likely to have a significant effect on the environment and has given a direction that the application for consent under the Petroleum Act 1998 need not be accompanied by an environmental statement. The main reasons and considerations on which this decision is based are summarised above and have taken full account of the characteristics of the project, the environmental sensitivity of the areas likely to be affected by the project and the nature and significance of the potential impacts, as set out in Schedule 1 to the Regulations.

Excluded Activities

Pursuant to regulation 5(10) of the above Regulations, the Secretary of State gives notice that, having regard to the matters set out in regulations 5(2) and/or 5(2A) and Schedule 1 to the Regulations, the Secretary of State has decided that the operations in respect of which consent is sought would not be likely to have a significant effect on the environment and accordingly no environmental statement need be prepared in respect of the relevant project.

Reference Operator Project Name Quad/ Block
EX-238-2020 BP Exploration Operating Co. Ltd Schiehallion Field Pipeline Works 204/20
EX-239-2020 Repsol Sinopec Resources UK Ltd Bleo Holm Pipeline Works 16/21
EX-240-2020 RockRose UKSC8 LLC Braemar Extension of Production Consent 16/3
EX-241-2020 Repsol Sinopec Resoucres UK Ltd Galley Extension of Production Consent 15/23
EX-242-2020 Apache North Sea Ltd Maule Extension of Production Consent 21/10
EX-243-2020 Repsol Sinopec Resources UK Ltd Tweedsmuir Extension of Production Consent 21/1
EX-244-2020 Total E&P UK Ltd Forvie North Extension of Production Consent 3/15
EX-245-2020 Britoil Ltd Foinaven Extension of Production Consent 204/24
EX-246-2020 Chrysaor Petroleum Co. UK Ltd Judy Extension of Production Consent 30/7
EX-247-2020 Tailwind Mistral Ltd Gannet E Extension of Production Consent 21/30
EX-248-2020 Shell UK Ltd Gannet A Extension of Production Consent 21/25
EX-249-2020 Shell UK Ltd Gannet C Extension of Production Consent 21/30
EX-250-2020 Shell UK Ltd Gannet F Extension of Production Consent 21/30
EX-251-2020 Shell UK Ltd Gannet G Extension of Production Consent 22/21
EX-252-2020 Repsol Sinopec Resources UK Ltd Orion Extension of Production Consent 30/18
EX-253-2020 Repsol Sinopec Resources UK Ltd Nethan Extension of Production Consent 30/17
EX-254-2020 Repsol Sinopec Resources UK Ltd Medwin Extension of Production Consent 30/17
EX-255-2020 Repsol Sinopec Resources UK Ltd Leven Extension of Production Consent 30/17
EX-256-2020 Shell UK Ltd Brent Extension of Production Consent 211/29
EX-257-2020 Shell UK Ltd Starling Extension of Production Consent 29/3
EX-258-2020 Shell UK Ltd Scoter Extension of Production Consent 22/30
EX-259-2020 Shell UK Ltd Merganser Extension of Production Consent 22/30
EX-260-2020 Petrogas Neo UK Ltd Donan Extension of Production Consent 15/20
EX-261-2020 Serica Energy (UK) Ltd Keith Extension of Production Consent 9/8
EX-262-2020 Chrysaor North Sea Ltd Seymour Extension of Production Consent 22/5
EX-263-2020 Chrysaor North Sea Ltd Hawkins Extension of Production Consent 22/5
EX-264-2020 EnQuest Heather Ltd Ythan Extension of Production Consent 211/18
EX-265-2020 EnQuest Heather Ltd Conrie Extension of Production Consent 211/18
EX-266-2020 EnQuest Heather Ltd Thistle Extension of Production Consent 211/18
EX-267-2020 EnQuest Heather Ltd Deveron Extension of Production Consent 211/18
EX-268-2020 EnQuest Heather Ltd Broom Extension of Production Consent 2/4
EX-269-2020 RockRose UKCS8 LLC Braemar Extension of Production Consent 16/3
EX-274-2020 BP Exploration Operating Company Limited Schiehallion Extension of Production Consent 204/20

Further information in relation to all the decisions detailed in this notice can be found on the GOV.UK website at:

https://www.gov.uk/guidance/oil-and-gas-environmental-data.

If you have any questions in relation to this notice or the decisions, please contact the Environmental Management Team, Offshore Petroleum Regulator for Environment and Decommissioning (OPRED), AB1 Building, Crimon Place, Aberdeen AB10 1BJ (e-mail: emt@beis.gov.uk).