Pipe-Lines
THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED)
DIRECTION DECISIONS
Pursuant to regulations 6(11) and 6(12) of the above Regulations, the Secretary of State gives notice of the following decision(s), in respect of application(s) made under regulation 6 of the above Regulations requesting a direction confirming that a relevant project need not be accompanied by an environmental statement and confirming the Secretary of State’s agreement to the grant of consent.
Reference | Operator | Project Name | Quad/ Block | Direction Issued |
DRA/779 | Chrysaor Petroleum Company U.K. Ltd | Jasmine West Limb Infill Development Well 30/07a-SM | 30/07 | 06/10/2020 |
DRA/796 | Ithaca Oil and Gas Ltd | Alba Field Development Well 16/26-A72 | 16/26 | 14/10/2020 |
Main reasons / conclusions on which decision is based | Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to marine environment, and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant. | |||
Mitigation features / measures | Any cuttings contaminated with oil-based mud will be treated offshore prior to discharge or shipped to shore for treatment and disposal. Appropriate controls will be in place to reduce the likelihood of accidental events. |
Reference | Operator | Project Name | Quad/Block | Direction Issued |
PLA/776 | Perenco UK Ltd | Indefatigable PL22 Pipeline Deposits | 49/23 | 06/10/2020 |
PLA/778 | Perenco UK Ltd | Leman PL23 Pipeline Deposits | 49/26 | 09/10/2020 |
PLA/786 | Perenco UK Ltd | Leman PL24 Pipeline Deposits | 52/4 | 09/10/2020 |
PLA/716 | Chrysaor Production (U.K.) Ltd | Callanish PL4917 Pipeline Deposits | 15/29 | 07/10/2020 |
Main reasons / conclusions on which decision is based | Main considerations related to deposit of materials on the seabed and interference with other users of the sea. Impacts assessed as localised and not significant. | |||
Mitigation features / measures | Deposits will be the minimum required to achieve objectives and designed to prevent unnecessary interference with other users of the sea. Works will be undertaken in accordance with applicable navigational conditions and appropriate controls will be in place to reduce the likelihood of accidental events. Agreement was given to the issue of consent providing works are undertaken as specified in the application. |
Reference | Operator | Project Name | Quad/ Block | Direction Issued |
PRA/287 | BP Exploration Operating Company Ltd | Vorlich Field Commencement of Production | 30/01 | 22/10/2020 |
Main reasons / conclusions on which decision is based | Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant. | |||
Mitigation features/measures | Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increases are as specified in the application. |
Reference | Operator | Project Name | Quad/Block | Direction Issued |
PRA/31 | Perenco UK Ltd | Johnston Field Increase in Production | 43/26 | 12/10/2020 |
PRA/125 | CNOOC Petroleum Europe Ltd | Golden Eagle Field Increase in Production | 20/01 | 13/10/2020 |
PRA/15 | Total E&P UK Ltd | Alwyn North Field Increase in Production | 3/09 | 01/10/2020 |
PRA/143 | BP Exploration Operating Company Ltd | Madoes Field Increase in Production | 22/24 | 20/10/2020 |
PRA/46 | Repsol Sinopec Resources UK Ltd | Montrose Field Increase in Production | 22/17 | 21/10/2020 |
PRA/46 | Repsol Sinopec Resources UK Ltd | Wood Field Increase in Production | 22/18 | 21/10/2020 |
PRA/41 | CNR International (U.K) Ltd | Columba E Increase in Production | 3/7 | 22/10/2020 |
PRA/15 | Total E&P UK Limited | Nuggets N1 Increase in Production | 3/19 | 05/10/2020 |
Main reasons / conclusions on which decision is based | Main considerations related to marine discharges and atmospheric emissions. Discharges assessed as no risk to the environment and atmospheric emissions rapidly dispersed to background levels. Impacts assessed as localised and not significant. | |||
Mitigation features / measures | Appropriate controls in place to reduce the likelihood of accidental events and agreement was given to the issue of consent, providing increase is as specified in the application. |
Having regard to the relevant application(s) for direction(s) submitted under the above Regulations, the Secretary of State has assessed the project(s) as not likely to have a significant effect on the environment and has given a direction that the application for consent under the Petroleum Act 1998 need not be accompanied by an environmental statement. The main reasons and considerations on which this decision is based are summarised above and have taken full account of the characteristics of the project, the environmental sensitivity of the areas likely to be affected by the project and the nature and significance of the potential impacts, as set out in Schedule 1 to the Regulations.
Excluded Activities
Pursuant to regulation 5(10) of the above Regulations, the Secretary of State gives notice that, having regard to the matters set out in regulations 5(2) and/or 5(2A) and Schedule 1 to the Regulations, the Secretary of State has decided that the operations in respect of which consent is sought would not be likely to have a significant effect on the environment and accordingly no environmental statement need be prepared in respect of the relevant project.
Reference | Operator | Project Name | Quad/ Block |
EX-237-202 | Total E&P UK Ltd | Glenelg Extension of Production Consent | 29/4 |
EX-270-2020 | BP Exploration Operating Company Ltd | Machar PL5025 Pipeline Works | 23/26 |
EX-271-2020 | BP Exploration Operating Company Ltd | Machar PL5026 Pipeline Works | 23/26 |
EX-272-2020 | Perenco UK Ltd | Leman South PL3027 Pipeline Works | 49/27 |
EX-273-2020 | Perenco UK Ltd | Ravenspurn North Extension of Production Consent | 43/26 |
EX-275-2020 | Shell U.K. Ltd | Penguins Field Pipeline Works | 211/13 |
EX-276-2020 | Perenco UK Ltd | Leman Extension of Production Consent | 49/27 |
EX-277-2020 | Apache Beryl I Ltd | Aviat Extension of Production Consent | 22/7 |
EX-278-2020 | Apache North Sea Ltd | Forties Extension of Production Consent | 21/10 |
EX-279-2020 | BP Exploration Operating Company Ltd | Vorlich Extension of Production Consent | 30/1 |
EX-280-2020 | Repsol Sinopec Resources UK Ltd | Auk Extension of Production Consent | 30/16 |
EX-281-2020 | NEO Energy (SNS) Ltd | Babbage Extension of Production Consent | 48/2 |
EX-282-2020 | Petrogas NEO UK Ltd | Balloch Extension of Production Consent | 15/20 |
EX-283-2020 | Repsol Sinopec Resources UK Ltd | Blake Extension of Production Consent | 13/24 |
EX-284-2020 | Repsol Sinopec Resources UK Ltd | Blane Extension of Production Consent | 30/3 |
EX-285-2020 | Repsol Sinopec Resources UK Ltd | Carnoustie Extension of Production Consent | 22/17 |
EX-286-2020 | Spirit Energy Resources Ltd | Chestnut Extension of Production Consent | 22/2 |
EX-287-2020 | Spirit Energy North Sea Ltd | Chiswick Extension of Production Consent | 49/4 |
EX-288-2020 | Ineos UK SNS Ltd | Clipper South Extension of Production Consent | 48/19 |
EX-289-2020 | Petrogas NEO UK Ltd | Donan Extension of Production Consent | 15/20 |
EX-290-2020 | One-Dyas UK Ltd | East Sean Extension of Production Consent | 49/25 |
EX-291-2020 | Repsol Sinopec Resources UK Ltd | Enoch Extension of Production Consent | 16/13 |
EX-292-2020 | Chrysaor North Sea Ltd | Everest Extension of Production Consent | 22/9 |
EX-293-2020 | Petrogas NEO UK Ltd | Flyndre Extension of Production Consent | 30/14 |
EX-294-2020 | ENI Hewett Ltd | Hewett Extension of Production Consent | 48/29 |
EX-295-2020 | Petrogas NEO UK Ltd | Lochranza Extension of Production Consent | 15/20 |
EX-296-2020 | Chrysaor North Sea Ltd | Lomond Extension of Production Consent | 23/21 |
EX-297-2020 | Igas Energy Enterprise Ltd | Lybster Extension of Production Consent | 11/24 |
EX-298-2020 | CNR International (U.K.) Ltd | Ninian Extension of Production Consent | 3/3 |
EX-299-2020 | Dana Petroleum (E&P) Ltd | Saxon Extension of Production Consent | 21/23 |
EX-300-2020 | Repsol Sinopec Resources UK Ltd | Scapa Extension of Production Consent | 14/19 |
EX-301-2020 | Shell U.K. Ltd | Penguin West Extension of Production Consent | 211/13 |
EX-302-2020 | Shell U.K. Ltd | Penguin East Extension of Production Consent | 211/13 |
EX-303-2020 | Dana Petroleum (E&P) Ltd | Guillemot West Extension of Production Consent | 21/29 |
EX-304-2020 | Dana Petroleum (E&P) Ltd | Saxon Extension of Production Consent | 21/23 |
EX-305-2020 | Dana Petroleum (E&P) Ltd | Pict Extension of Production Consent | 21/23 |
Further information in relation to all the decisions detailed in this notice can be found on the GOV.UK website at:
https://www.gov.uk/guidance/oil-and-gas-environmental-data.
If you have any questions in relation to this notice or the decisions, please contact the Environmental Management Team, Offshore Petroleum Regulator for Environment and Decommissioning (OPRED), AB1 Building, Crimon Place, Aberdeen AB10 1BJ (e-mail: emt@beis.gov.uk).