Pipe-Lines

HillingdonYorkHighlandMorayOrkney IslandsAberdeenshireFifeAberdeen CityCity of EdinburghShetland IslandsAB10 1SH57.145585-2.106349AB10 1XE57.1435-2.117546AB11 9DB57.138001-2.07178AB42 1DJ57.503753-1.774212AB43 9BR57.692987-2.00427AB56 4BT57.679697-2.947876EH6 6QQ55.978349-3.173673IV21 2DZ57.806367-5.801519KW14 7UJ58.612077-3.54948KW15 1HU58.986904-2.960879KY10 3DF56.223571-2.700902UB8 1LU51.549994-0.484362YO31 7PF53.963899-1.075839ZE1 0LL60.155003-1.143411PETROLEUM ACT 1998Petroleum Act 19982022-03-212022-03-222022-04-19TSO (The Stationery Office), customer.services@thegazette.co.uk402564628628

PETROLEUM ACT 1998

NOTICE OF APPLICATION FOR A SUBMARINE PIPELINE WORKS AUTHORISATION

CNOOC Petroleum Europe Limited hereby gives notice on behalf of its self and Dana Petroleum (E&P) Limited, Energean UK LTD, MOL Operations UK LTD and NEO Energy Exploration UK Limited in accordance with the provisions of Part I of Schedule 2 to the Petroleum Act 1998 that it has made an application to the Oil and Gas Authority for the grant of an authorisation for the construction and use of a pipeline between the Scott UQ Platform ESD Valve and the South Water Injection Manifold.

A map (or maps) delineating the route of the proposed pipeline and providing certain further information may be inspected free of charge at the places listed in the Schedule to this notice from 10am to 4pm on each weekday from the date that this notice is published until the date mentioned in the next paragraph of this notice. Alternatively log on to the following page to view electronically, https://www.ogauthority.co.uk/licensing-consents/consents/pipeline-works-authorisations/public-notices/

Pursuant to a direction of the Oil and Gas Authority, representations with respect to the application may be made in writing by email to consents@ogauthority.co.uk and addressed to the Oil and Gas Authority, Consents and Authorisations, Second Floor, 48 Huntly Street, Aberdeen, AB10 1SH (marked FAO OGA Consents & Authorisations Manager, Offshore Pipeline Authorisations) not later than 19 April 2022 and should bear the reference "PA/3666" and state the grounds upon which the representations are made.

22nd March 2022

CNOOC Petroleum Europe Limited

Prospect House,

97 Oxford Road,

Uxbridge,

UB8 1LU

Stelios Kalidakis

Project Manager – Scott South and Telford WI Replacement

SCHEDULE TO THE NOTICE FOR PUBLICATION PLACES WHERE A MAP MAY BE INSPECTED

CNOOC Petroleum Europe Limited Prospect House, 97 Oxford Road, Uxbridge, UB8 1LU Oil & Gas Authority Consents & Authorisations AB1 Second Floor 48 Huntly Street Aberdeen AB10 1SHc
Marine Scotland Compliance Area 1-A North Victoria Quay Edinburgh EH6 6QQ Scottish Fisheries Protection Agency Old Harbour Buildings Scrabster Caithness KW14 7UJ
Orkney Fisheries Association 5 Ferry Terminal Building Kirkwall Orkney KW15 1HU Fishery Office 13-19 Alexandra Buildings Esplanade Lerwick Shetland ZE1 0LL
Anstruther Fishery Office 28 Cunzie Street Anstruther KY10 3DF Scottish Fishermen's Federation 24 Rubislaw Terrace Aberdeen AB10 1XE
Fishery Office Suite 3-5 Douglas Centre March Road Buckie AB56 4BT Aberdeen Fishery Office Room A119 PO Box 101 375 Victoria Road Aberdeen AB11 9DB
Fishery Office Caley Building 28-32 Harbour Street Peterhead AB42 1DJ Fishery Office 121 Shore Street Fraserburgh AB43 9BR
Highlands and Islands Fishermen's Association Rona 7 Aultgrishan Gairloch Ross-Shire IV21 2DZ National Federation of Fishermens' Organisations 30 Monkgate York YO31 7PF
Fishery Office Kirkwall Terminal Building East Pier Kirkwall KW15 1HU