Pipe-Lines
PETROLEUM ACT 1998
NOTICE OF THE ISSUE OF A SUBMARINE
PIPELINE WORKS AUTHORISATION
The North Sea Transition Authority gives notice that it has decided to issue, and in consequence has issued, a works authorisation to be held by NEO Energy Production UK Limited whose address is 30 St. Mary Axe, London, EC3A 8BF for the construction and use of a pipeline system between the Affleck Manifold and the Talbot Combined Manifold as well as between the Judy Platform Umbilical TUTU and the Affleck Manifold.
The North Sea Transition Authority (NSTA) is the business name of the Oil and Gas Authority (OGA). The OGA remains the legal name of the company. References in this notice to the NSTA should be interpreted as the OGA.
Except with the consent of the NSTA, the
The 168.3 Millimetre Production Jumper pipelines shall only be used to convey Produced Fluids; the 323.9 Millimetre Production Flowline shall only be used to convey Well Fluids; the 60 Millimetre Umbilical Jumpers shall only be used to convey Scale Inhibitor, Methanol, LP/HP Hydraulic and Power/Signal and the 205.1 Millimetre Services Umbilical shall only be used to convey Wax Inhibitor, Corrosion Inhibitor, Scale Inhibitor, Methanol, LP/HP Hydraulic and Power/Signal;
The pipelines may be used by the Holder and with the Holder's agreement, and with the consent of the NSTA, by other persons.
NEO Energy Production UK Limited have been appointed operator of the pipelines.
DAVID REAICH
The Oil and Gas Authority