Electricity
CORLACKY ENERGY LTD
PUBLIC NOTICE APPLICATION FOR A GENERATING LICENCE UNDER ARTICLE 10(1)(A) OF THE ELECTRICITY (NI) ORDER 1992 AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER 2003
1. Full name of the applicant(s):
Corlacky Energy Limited
2. Address of the applicant(s) or, in the case of a body corporate, the registered or principal office:
42-46 Fountain Street, Belfast, Northern Ireland, BT1 5EF
3. Full name of the agent(s):
David McVeigh, Renewable Energy Systems Limited, registered in UK, Registration number 01589961.
4. Address of the agent(s) or, in the case of a body corporate, the registered or principal office:
Beauford Court, Egg Farm Lane, Station Road, Kings Lang-ley, Hertfordshire, WD4 8LR.
5. Type of application:
Generation Licence
6. Where the applicant is a company, the full address, the names of the current directors and the companies registered number:
Corlacky Energy Ltd. 42-46 Fountain Lane Street, Belfast, Northern Ireland, BT1 5EF. Directors: Charles Napier Williams, Lynette Katherine Hamilton Purves, Killian Halpin.
Registration number NI670694
7. Where a holding of 20% or more of the shares of an applicant is held by a body corporate, partnership of unincorporated association carrying on a trade with or without a view to profit, provide the name(s) and address(es) of the holder(s) of such shares shall be provided:
ERG UK Holding Ltd. 2 Castle Terrace, 4th Floor, Edinburgh, EH1 2DP.
8. Desired date from which the licence is to take effect:
31st October 2025
9. The number of generating stations intended to be operated under the Licence (if granted):
11 Wind Turbines
10. A sufficient description specifying the actual of proposed locations of those stations, e.g. by reference to townlands, local government districts, postal address, etc.:
Corlacky Hill Wind Farm is located approximately 3km west of Swatragh, Co.Derry / Londonderry. The centre of the site is located at Irish Grid Reference 280904E, 407735N.
11. A description of how those stations will, in each case, be fuelled or driven:
Self driven wind turbines
12. The date of when any proposed generating stations are expected to be commissioned:
31st October 2025
13. The capacity and type of each unit within the generating station (MW):
Eleven no. wind turbines each with a capacity of 4.3MW. The overalls wind farm maximum export capacity (MEC) will be 47.3MW.
14. A statement of the extent (if any) to which the applicant considers it necessary for powers under schedule 3 (compulsory acquisition of land etc.) and under schedule 4 (other powers etc.) to the order to be given through the licence for which he is applying, together with a statement of specific purposes for which those powers are felt to be necessary:
None.
15. Details of any licences held, applied for, or being applied for by the applicant in respect of the generation, participation in transmission or supply of electricity:
None.
A map forms part of the documents and particulars provided for this application, a copy of the map is available for inspection by the public at the principal office of the Authority between 10:00 a.m. and 4:00 p.m. on any working day at this address; Utility Regulator, Queens House, 14 Queen Street, Belfast BT1 6ED