Electricity
APPLICATION FOR SUPPLY AND GENERATING LICENCE UNDER ARTICLE 10(1)(A) OF THE ELECTRICITY (NI) ORDER 1992 AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER 2003
1. FULL NAME OF THE APPLICANT(S):
Veolia Energy Services NI Limited (VESNIL)
2. ADDRESS OF THE APPLICANT(S) OR, IN THE CASE OF A BODY CORPORATE, THE REGISTERED OR PRINCIPAL OFFICE:
2 Rocklyn Way, Ballywilliam, Donaghadee Co Down, BT21 0GD
3. TYPE OF APPLICATION
Supply and Generation licence for a Virtual Power plant to cover Northern Ireland.
4. WHERE THE APPLICANT IS A COMPANY, THE FULL ADDRESS, NAMES OF THE CURRENT DIRECTORS AND THE COMPANY’S REGISTERED NUMBER:
Veolia Energy Services NI Limited (VESNIL)
2 Rocklyn Way, Ballywilliam, Donaghadee Co Down, BT21 0GD
Directors: John Abraham, Fergus Elebert, Sinead Patton
Registered Number NI073352 2
Registration Date 30/07/2009
5. WHERE A HOLDING OF 20 PER CENT, OR MORE OF THE SHARES (SEE NOTE) OF THE APPLICANT IS HELD BY A BODY CORPORATE OR PARTNERSHIP OR AN UNINCORPORATED ASSOCIATION CARRYING ON A TRADE OR BUSINESS WITH OR WITHOUT A VIEW TO PROFIT, THE NAME(S) AND ADDRESS(ES) OF THE HOLDER(S) OF SUCH SHARES SHALL BE PROVIDED:
Not applicable
6. DESIRED DATE FROM WHICH THE LICENCE IS TO TAKE EFFECT:
ASAP - DSU wishes to enter T-1 2025/26 auction in October 2024.
7. THE NUMBER OF GENERATING STATIONS INTENDED TO BE OPERATED UNDER THE LICENSE (IF GRANTED):
DSU Containing 3 existing clients (Water treatment plants)
8. A SUFFICIENT DESCRIPTION SPECIFYING THE ACTUAL OR PROPOSED LOCATIONS OF THOSE STATIONS, E.G. BY REFERENCE TO TOWNLANDS, LOCAL GOVERNMENT DISTRICTS, POSTAL ADDRESS, ETC.:
Locations are already existent Water sites:
· WWT located in Ballynacor
· WTWW located in Donaghadee
· PS located in Groomsport
9. A DESCRIPTION OF HOW THOSE STATIONS WILL, IN EACH CASE, BE FUELLED OR DRIVEN:
The clients will support the GRID with their existing generation whenever required through Demand Side Unit.
10. THE DATE WHEN ANY PROPOSED GENERATING STATIONS ARE EXPECTED TO BE COMMISSIONED:
Proposed sites above are already installed. Pending licence in order to arrange SONI testing.
11. THE CAPACITY AND TYPE OF EACH UNIT WITHIN THE GENERATING STATION (MW):
Approximately 6MW Aggregated Capacity. This value will increased as more sites are installed after phase 1.
12. A STATEMENT OF THE EXTENT (IF ANY) TO WHICH THE APPLICANT CONSIDERS IT NECESSARY FOR POWERS UNDER SCHEDULE 3 (COMPULSORY ACQUISITION OF LAND ETC.) AND UNDER SCHEDULE 4 (OTHER POWERS ETC.) TO THE ORDER TO BE GIVEN THROUGH THE LICENCE FOR WHICH HE IS APPLYING, TOGETHER WITH A STATEMENT OF SPECIFIC PURPOSES FOR WHICH THOSE POWERS ARE FELT TO BE NECESSARY:
Not applicable for DSU.
13. DETAILS OF ANY LICENCES HELD, APPLIED FOR, OR BEING APPLIED FOR BY THE APPLICANT IN RESPECT OF THE GENERATION, PARTICIPATION IN TRANSMISSION OR SUPPLY OF ELECTRICITY:
None