Road Traffic Acts

HackneyE8 1DY51.54532-0.057953Road Traffic Regulation Act 19842024-09-06TSO (The Stationery Office), customer.services@thegazette.co.uk469943564508

LONDON BOROUGH OF HACKNEY

THE HACKNEY (WAITING, LOADING AND STOPPING RESTRICTIONS) (MAP BASED) (CONSOLIDATION) (AMENDMENT NO.*) ORDER 2024

THE HACKNEY (PARKING PLACES) (MAP BASED) (CONSOLIDATION) (AMENDMENT NO.*) ORDER 2024

TT1740

1. NOTICE IS HEREBY GIVEN that the Council of the London Borough of Hackney proposes to make the above-mentioned Orders under the Road Traffic Regulation Act 1984 as amended.

2. The general effect of the Orders will be to introduce Electric Vehicle bays in the following locations;

Road Name Location
Charnock Road 9.7m away west direction from existing kerb line of Powell Road. Install a new 14.2m electric vehicle bay in the west direction replacing a permit bay.
Edenbridge Road 6.3m away north direction from the existing junction line of Penshurst Road. Install a new 14.2m electric vehicle bay in the north direction replacing a permit bay.
Glenarm Road 9.6m away west direction from existing kerb line of Median Road. Install a new 14.2m electric vehicle bay in the west direction replacing resident’s permit bay.
Heyworth Road 7.2m away west direction from existing kerb line of Powell Road. Install a new 15.8m electric vehicle bay in the west direction replacing a permit bay.

3. The general effect of the Orders will be to introduce Electric Vehicle charging bays with a maximum stay of 4 hours no return within 2 hours in the following locations;

Road Name Location
Clifden Road 10.2m away east direction from the existing kerb line of Churchill Walk. Install a new 13.7m electric vehicle bay in the east direction replacing the cashless shared use bay.
Downs Road 2.7m away east direction from the existing kerb line of Clapton Way. Install a new 31.0m electric vehicle bay in the east direction replacing the cashless shared use bay.
Ravensdale Road 34m away east direction from junction line of Stamford Hill. Install a new 28.9m electric vehicle bay in the east direction replacing the cashless shared use bay.
Timberwharf Road 7.4m away south direction from the existing junction line of Craven Park Road. Install a new 28.7m electric vehicle bay in the south direction replacing cashless shared use bay.

4. Plans of the proposed locations can be viewed here - https://hackney.traffweb.app/traffweb/2/PublicConsultation Documents giving more detailed particulars are also available for inspection by email request to streetscene.consultations@hackney.gov.uk. Alternatively, such documents can be inspected during normal office hours on Mondays to Fridays, in the visitor’s reception area, London Borough of Hackney, Hackney Service Centre, 1 Hillman Street, London, E8 1DY by appointment only.

5. Any objections or other representations about either of the Orders should be sent in writing to Streetscene – Networks Team at the address specified in paragraph 3 above or emailed to streetscene.consultations@hackney.gov.uk within 28 days from the date on which this Notice is published. All objections must specify the grounds on which they are made.

Dated this 6th day of September 2024

Tyler Linton

Assistant Director - Streetscene

(Duly appointed officer)