Town and Country Planning

BarnetEN4 9SH51.650763-0.173129NW9 4EW51.597619-0.245016TOWN AND COUNTRY PLANNING ACT 1990Town and Country Planning Act 1990Town and Country Planning Act 1990, s. 2472020-07-162024-05-302024-09-262024-10-25TSO (The Stationery Office), customer.services@thegazette.co.uk471200364526

LONDON BOROUGH OF BARNET

STOPPING UP OF HIGHWAY AT/ ADJACENT TO VICTORIA ROAD AND ALBERT ROAD, NEW BARNET, EN4 9SH

(STOPPING UP ORDER NO.1 2024)

NOTICE OF INTENTION TO MAKE A STOPPING UP ORDER

SECTION 247 TOWN AND COUNTRY PLANNING ACT 1990

NOTICE is hereby given that the London Borough of Barnet (“the Council”) acting in its capacity as local highway authority proposes to make an Order under section 247 of the Town and Country Planning Act 1990 (as amended) (“the Act”) authorising the stopping up of the highways described in the First Schedule below and shown hatched with bold black diagonal lines on Drawing No. 105712-PEF-XX-00-DR-D-0009-T07 to the Order.

IF THE PROPOSED ORDER IS MADE, the stopping up will enable the redevelopment of land formerly known as British Gas Works, Albert Road, New Barnet, EN4 as described in the Second Schedule to be carried out in accordance with the planning permission granted by the Council under Part III of the Act on 16 July 2020 under planning reference 16/7601/FUL and any subsequent permissions granted under section 73 of the Act which vary or amend this planning permission which do not affect the area being stopped up and will be for no other purpose.

COPIES OF THE DRAFT ORDER AND RELEVANT PLAN MAY BE INSPECTED - free of charge between the hours of 9.00am and 4.30pm Monday to Friday (excluding bank holidays and public holidays) for a period of 28 days commencing on 26 September 2024 from the main reception, London Borough of Barnet, 3rd Floor, 2 Bristol Avenue, Colindale, London NW9 4EW. Please contact the Council at highway.development@barnet.gov.uk or on 020-8359-3555 to arrange for a copy of the draft Order and relevant plan to be posted. A copy may also be viewed on the Council’s website at www.barnet.gov.uk

ANY OBJECTION to the making of the proposed Order must be made in writing within a period of 28 days commencing on 30 May 2024 by sending written notice to the Highways Development Control Manager, Highways Service, Environment Directorate, London Borough of Barnet, 3rd Floor, 2 Bristol Avenue, Colindale, London NW9 4EW or by email to highway.development@barnet.gov.uk before 5pm on 25 October 2024.

The Council may disclose the substance of any objection made to the making of the Order to other persons affected by it and that those persons may wish to communicate with the objector. If no objections are duly made to the making of the Order, or if any objections are withdrawn, the Council may make the Order as an unopposed Order. Any objections duly made and which are not withdrawn will be referred to the Mayor of London. THIS NOTICE is given by virtue of Section 252 of the above Act.

FIRST SCHEDULE

DESCRIPTION OF HIGHWAYS TO BE STOPPED UP

The highway areas/references and sections listed in the table below and shown hatched with bold black diagonal lines on Drawing No. 105712-PEF-XX-00-DR-D-0009-T07 to the Order referred to in this Notice. The dimensions quoted in the table are approximate averages and have been rounded to the nearest half metre. The drawing should be referred to for exact locations.

Name/Reference of Highway Location Description Starting Grid Reference Ending Grid Reference Highway to be Stopped Up
Length (m) Width (m) Area (m2)
Area 1 Albert Rd, London, Barnet, EN4 9SH A-B (inc B1 & A1) Carriageway & Footway E - 526481.912 E - 526477.878 5 4 23
N - 196312.237 N - 196311.238
Area 2 Albert Rd, London, Barnet, EN4 9SH I-N (inc J,K,L,M,X,Y,Z) Carriageway & Footway E - 526497.107 E - 526545.531 69 0-10 308
N - 196301.991 N - 196258.638
Area 3 Victoria Road, London, Barnet, EN4 9SH S-U (inc T,V) Footway E - 526590.652 E - 526593.947 7 0-1 4
N - 196229.165 N - 196233.083
Area 4 Albert Rd, London, Barnet, EN4 9SH JJ-HH (inc AA,BB,CC,) Footway & Carriageway E - 526528.408 E - 526499.011 29 0-15 252
N - 196267.901 N - 196260.911
Area 5 Albert Rd, London, Barnet, EN4 9SH MM-PP (inc NN,OO,QQ) Footway E - 526532.447 E - 526542.024 44 0-3 89
N - 196255.205 N - 196211.938
Area 6 Albert Rd, London, Barnet, EN4 9SH E1-D (inc F1,C) Footway & Carriageway E - 526481.427 E - 526487.463 24 0-5 84
N - 196297.312 N - 196273.453
Area 7 Albert Rd, London, Barnet, EN4 9SH P-R (inc Q) Footway E - 526549.358 E - 526559.683 30 0-3 64
N - 196247.354 N - 196218.238

SECOND SCHEDULE

Description of Development -

Demolition of the existing residential and non-residential buildings (1 to 9 Victoria Road, 15 to 23 Victoria Road and 1A, 2 and 2A Albert Road) and construction of 104 residential units (Use Class C3) within Buildings A, H, J1 and J2 (an increase of 52 residential units across the Victoria Quarter Redevelopment Area), 623sqm of commercial/retail/office floorspace (Use Class A1-A4/B1/D1/D2) within Building A and Building J1, the creation of new publicly accessible open spaces and pedestrian routes together with associated access, servicing, car parking, cycle parking and landscaping. Relocation of an existing sub-station.

Dated this 26th September 2024

Ian Edser, Director of Highways and Transportation, Environment Directorate, London Borough of Barnet, 2 Bristol Avenue, Colindale, London, NW9 4EW