Town and Country Planning

2014-01-092013-12-20Planning Act 2008PLANNING ACT 2008TSO (The Stationery Office), St Crispins, Duke Street, Norwich, NR3 1PD, 01603 622211, customer.services@tso.co.uk1963545

Thames Water Utilities Limited

NOTICE OF PROPOSAL TO ISSUE CERTIFICATES UNDER SECTIONS 131 (4A) AND 132(3) OF THE PLANNING ACT 2008

PLANNING ACT 2008 (AS AMENDED)

DRAFT THAMES WATER UTILITIES LIMITED (THAMES TIDEWAY TUNNEL) DEVELOPMENT CONSENT ORDER 2013

PROPOSED CERTIFICATES IN RESPECT OF COMPULSORY ACQUISITION OF OPEN SPACE AND RIGHTS OVER OPEN SPACE PURSUANT TO SECTION 131(4A) AND SECTION 132(3)

  • 1 Thames Water Utilities Limited (“the Applicant”) has made the above application under the Planning Act 2008 (“the Act”) for an order granting development consent for the Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order (“the Order”). If made, the Order will authorise the compulsory acquisition of land and rights, by the creation of new rights (“the Order Rights”), over land forming part of open space as defined in the Act, that is any land laid out as a public garden, or used for the purposes of public recreation, or land being disused burial ground (“the Order Land”).
  • 2 The Order will be subject to special parliamentary procedure, to the extent that it authorises the compulsory acquisition of land and rights over land to which section 131 and 132 of the Act applies, unless the Secretary of State issues a certificate in accordance with the provisions of section 131 and 132 of the Act (“the Certificates”). The Secretary of State has been asked by the Applicant to certify that:—
    • i under section 131(4A), that he is satisfied that the Order Land is, or forms part of, an open space, none of the Order Land is a common, or fuel or field garden allotment, there is no suitable land available to be given in exchange for the Order Land or any suitable land available to be given in exchange is available only at prohibitive cost, and it is strongly in the public interest for the development for which the order grants consent to be capable of being begun sooner than is likely to be possible if the order were to be subject to special parliamentary procedure;
    • ii under section 132(3) that he is satisfied that the Order Land, when burdened with the Order Rights, will be no less advantageous than it was before to the following persons:—
    ii under section 132(3) that he is satisfied that the Order Land, when burdened with the Order Rights, will be no less advantageous than it was before to the following persons:—
    • a the persons in whom it is vested,
    • b ther persons, if any, entitled to rights of common or other rights, and
    • c the public.
  • 3 The Order Land is described in the Schedule to this Notice and the Order Rights which are to be acquired. On the plan referred to in paragraph 5 below, the Order Land is shown coloured shaded pink for land which is to be compulsorily acquired; shaded purple for land for which rights are to be acquired; and shown shaded pink and striped for foreshore which is to be compulsorily acquired (“the Plan”).
  • 4 The Secretary of State is required to give notice of his proposal to issue the Certificates or to direct the Applicant to do so and give any persons interested an opportunity to make representations about the proposal to grant the Certificates in respect of Compulsory Acquisition of Open Space and Rights over Open Space pursuant to Section 131(4A) and Section 132(3) before he reaches a decision. The Applicant hereby gives that notice. Any representations or objections in relation to the proposal to grant the Certificates should be addressed in writing to:—

The National Planning Casework Unit

5 St Philips Place

Colmore Row

Birmingham

B3 2PW

Or emailed to ThamesTidewayTunnel.npcu@communities.gsi.gov.uk

by 9 January 2014 quoting reference NPCU/RARECT/s131/132/72270 and if your objection relates to a specific site please state the site name from the table below.

  • 5 Copies of the documents taken into account by the Secretary of State in determining whether to issue the Certificates, including the Plan are on deposit at

• Institution of Civil Engineers, 1 Great George Street, London SW1P 3AA

• Linden House, Upper Mall, Hammersmith, London W6 9TA

• Glazier’s Hall, 9 Montague Close, London SE1 9DD

and may be seen there during the hours of 09:00 – 17:00 Monday to Friday excluding public and bank holidays. They may also be found at www.infrastructure.planningportal.gov.uk/projects/london/thames-tideway-tunnel/

  • 6 The Secretary of State for Communities and Local Government may cause a public local inquiry to be held in relation to the proposal to issue the Certificates.

20 December 2013

SCHEDULE

Order Land and Order Rights

London Borough and site name Land or foreshore Plot Number Area (m²) Total area of site Plot Description Purpose for which land and rights are required Certificate under Section 131(4A) or 132(3)

London Borough of Richmond upon Thames

Barn Elms

Land 64 17161 18,307m² Sports field and equipment, car park, footways and shrubbery (Barn Elms School Sports Centre, Queen Elizabeth Walk) Construction and maintenance of permanent works including CSO drop shaft (Work No. 4a), interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosk, ventilation columns, other ventilation structures and equipment, new permanent access road and hardstanding, habitat enclosure, replacement changing rooms and landscaping (Work No. 4c). s131(4A)
71 3 Sports field and shrubbery (Barn Elms School Sports Centre, Queen Elizabeth Walk) s131(4A)
80 1143 Sports field, footways and shrubbery (Barn Elms School Sports Centre, Queen Elizabeth Walk) s131(4A)

London Borough of Wandsworth

Putney Embankment Foreshore

Foreshore 17 906 5,261m² River (River Thames), foreshore and bed thereof Construction and maintenance of permanent works including CSO drop shaft (Work No. 5a), foreshore structure, new storm overflow, interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosk, ventilation columns, other ventilation structures and equipment, new river wall, scour protection, outfall apron and landscaping (Work No. 5c). s131(4A)
18 131 River (River Thames), foreshore and bed thereof s131(4A)
24 1710 River (River Thames), foreshore and bed thereof s131(4A)
Land (Waterman’s Green) 29 464 Grassed area (Waterman’s Green) adjacent to Putney Bridge s131(4A)
Foreshore 38a 482 Bridge carrying public road and footways (Putney Bridge, A219) and river (River Thames), foreshore and bed thereof below s131(4A)
41 88 River (River Thames), foreshore and bed thereof s131(4A)
46 1480 River (River Thames), foreshore and bed thereof Rights required for access: Right of access for the purpose of maintaining Work Nos. 5a, 5b and 5c s.132(3) - Temporary at surface level, Permanent rights

London Borough of Wandsworth

King George’s Park

Land 176 1644 2,640m² Public park (Kings George’s Park), footways and shrubbery Construction and maintenance of permanent works including CSO drop shaft (Work No. 9a), interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosk, ventilation columns, other ventilation structures and equipment, hardstanding area and landscaping (Work No. 9b). s131(4A)
178 996 Public park and footway (King George’s Park) s131(4A)

London Borough of Wandsworth

Falconbrook Pumping Station

Land 195 29 1,357m² Hardstanding (Falconbrook Pumping Station) Construction and maintenance of permanent works including CSO drop shaft (Work No. 10a), interception chamber, other chambers, culverts, pipes, ducts, railings and landscaping (Work No. 10c). s131(4A)
208 68 Shrubbery and public footway (Falconbrook Pumping Station) s131(4A)
210 757 Shrubbery, hardstanding, car park, public footway and access (Newcomen Road) s131(4A)
211 44 Public footway (Falconbrook Pumping Station) s131(4A)
212 146 Hardstanding and access (Newcomen Road) s131(4A)
214 268 Hardstanding and access road (off Newcomen Road) Rights required for access: Right of access to the permanent works for the purpose of maintaining and Work Nos. 10a, 10b and 10c s.132(3) Temporary at surface level, Permanent rights
215 17 Hardstanding and access road (off Newcomen Road) Rights required for access: Right of access to the permanent works for the purpose of maintaining and Work Nos. 10a, 10b and 10c s.132(3) Temporary at surface level, Permanent rights
221 28 Hardstanding and public footway (Falconbrook Pumping Station) Construction and maintenance of permanent works including CSO drop shaft (Work No. 10a), interception chamber, other chambers, culverts, pipes, ducts, railings and landscaping (Work No. 10c). s131(4A)

Royal Borough of Kensington & Chelsea

Chelsea Embankment Foreshore

Land 42 127 577m² Grassed area and shrubbery (off Chelsea Embankment), excluding river wall

Construction and maintenance of permanent works including Low Level Sewer overflow weir chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, ventilation columns, other ventilation structures and equipment, river wall,

wall and landscaping (Work No. 12c).

Subsurface only - construction and maintenance of connection culvert beneath Chelsea Embankment and beneath the foreshore (part of Work No. 12c)

s131(4A)
Land (RanElagh Gardens) 44 450 Footway and gardens (Ranelagh Gardens) s131(4A)

London Borough of Lambeth

Albert Embankment Foreshore

Foreshore 14 6 6,508m² River (River Thames), foreshore and bed thereof above London Underground tunnel (Victoria line) Construction and maintenance of permanent works including CSO drop shaft (Work No. 15a), foreshore structures, new storm overflow, interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosks, ventilation columns, other ventilation structures and equipment, scour protection, outfall aprons, river walls and landscaping (Work No. 15c). s131(4A)
15 428 River (River Thames), foreshore and bed thereof s131(4A)
20 125 River (River Thames), foreshore and bed thereof s131(4A)
22 268 River (River Thames), foreshore and bed thereof, below bridge carrying public road and footways (Vauxhall Bridge, A202) s131(4A)
23 544 River (River Thames), foreshore and bed thereof, below bridge carrying public road and footways (Vauxhall Bridge, A202) s131(4A)
28 3747 River (River Thames), foreshore and bed thereof s131(4A)
29 4 River (River Thames), foreshore and bed thereof and storm relief channel (River Effra) s131(4A)
33 156 River (River Thames), foreshore and bed thereof s131(4A)
37 874 River (River Thames), foreshore and bed thereof s131(4A)
38 356 Dock (Lack’s Dock) and river (River Thames), foreshore and bed thereof (excluding all interests of the Crown) s131(4A)

London Borough of Lewisham

Deptford Church Street

Land 155 38 4,235m² Grassed area and land between Crossfield Street and Coffey Street

Construction and maintenance of permanent works including CSO drop shaft (Work No. 22a), interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosks, ventilation columns, other ventilation structures and equipment and landscaping (Work No. 22b).

Subsurface only - construction and maintenance of CSO interception chamber beneath Deptford Church Street (part of Work No. 22b)

s131(4A)
156 2684 Grassed area, wall and land (between Crossfield Street, Coffey Street and Deptford Church Street) s131(4A)
160 1100 Grassed area, wall and land (between Crossfield Street, Coffey Street and Deptford Church Street) s131(4A)
161 400 Grassed area, wall and land (between Crossfield Street, Coffey Street and Deptford Church Street) s131(4A)
162 13 Grassed area and land between Crossfield Street and Coffey Street s131(4A)

London Borough of Tower Hamlets

King Edward Memorial Park

Foreshore 21 629 11,415m² River (River Thames), foreshore and bed thereof Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b s.132(3) - Permanent at subsoil level, Temporary at surface level, Permanent rights
22a 33 River (River Thames), foreshore and bed thereof Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b s.132(3) - Permanent at subsoil level, Temporary at surface level, Permanent rights
23a 20 River (River Thames), foreshore and bed thereof Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b s.132(3) -Temporary at surface level, Permanent rights
24 47 River (River Thames), foreshore and bed thereof Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b s.132(3) - Temporary at surface level, Permanent rights
Land 25 52 Public park (King Edward Memorial Park), hardstanding and public footpath (Thames Path) Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b s132(3) -Temporary at surface level, Permanent rights
Foreshore 26 1684 River (River Thames), foreshore and bed thereof Construction and maintenance of permanent works including CSO drop shaft (Work No. 24a), foreshore structure, new storm overflow, interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosks, ventilation columns, other ventilation structures and equipment, scour protection, river wall and landscaping (Work No. 24b). s131(4A)
29 334 River (River Thames), foreshore banks and bed thereof s131(4A)
Land 30 8616 Public park (King Edward Memorial Park), footways, gardens, hardstanding, playground and footpath (Thames Path) and tunnel carrying public road (Rotherhithe Tunnel, A101) below s131(4A)